7/6/22 Onyx Bridge HVAC Construction Activity Advisory

Begin:  Wednesday, July 6th, 2022 at 7:00 am

End:      Wednesday, July 6th, 2022 at 9:00 am

Building(s) or Area(s) Affected:  Onyx Bridge

Scope:  As part of an HVAC installation within room 291, be advised that contactors will be drilling through the adjacent hallway wall, for approximately two hours, in order to prep for incoming refrigerant lines.

Services Impacted:

  • The areas that will be affected by the construction noise and activity are room 291 and the adjacent hallway, as shown in the picture below.
  • This is not expected to cause disturbances to adjacent spaces beyond some moderate construction noise during the course of the work.

Work Performed By:  Phoenix Mechanical

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

To view current construction and impacts. visit UO Map.