Begin: Monday, December 6th, 2021 at 6:00 am
End: Monday, December 6th, 2021 at 10:00 am
Building(s) or Area(s) Impacted: Huestis Hall basement / Zebrafish Facility
Scope: As part of phase 1 for the Huestis Hall renovation project, power to electrical panel BN1-4 will be temporarily shut down in the Huestis basement to allow for a temporary power connection to support the renovation work.
Services Impacted: The electrical and HVAC air supply shutdown will affect equipment in the Zebrafish facility.
Special Instructions: Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on. A power surge can corrupt the clone files in the machines and change preconfigured settings.
Work Performed By: Mortenson Construction
Contact: Martina Oxoby, CPFM Owner’s Representative, 541-346-5880