Electrical Outage (near Gallery Walk) 4/26/21 – 4/27/21

Begin:  Monday, April 26th, 2021 at 6:00 pm

End:      Tuesday, April 27th, 2021 at 2:00 am

Building(s) or Area(s) Impacted:  Millrace 1 (#95), Millrace 2 (#96), Millrace 3 (#97), Millrace Workshop (#98), Greenhouse Preparation (#109), Old Greenhouse (#110), Research Greenhouse (#111), Paleoecology Research (#112), Archaeology Research (#116), Fine Arts Studio Sculpture (#125A), Fine Arts Studio Ceramics (#125B), Fine Arts Studio Metalsmith/Jewelry (#125C)

Scope:  EWEB electrical outage for 8 hour period to transition overhead lines to underground through newly installed electrical switch.

Services Impacted:  Electricity will be off line during this time.

Special Instructions:  Please shut down all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By:  EWEB

ContactDarin Dehle, CPFM Director Capital Construction, 541-346-2282