UPDATE 2:33 pm:
The autoclave clean steam heat exchanger is back online. Please allow 4-8 hours for the chemical treated steam to work its way out of the pipeline.
Begin: Tuesday, March 23rd, 2021 at 7:00 am
End: Thursday, March 25th, 2021 at 3:00 pm
Building(s) or Area(s) Impacted: Cascade Annex, Columbia Hall, Huestis Hall, Klamath Hall, Lewis Integrative Science Building (LISB), Onyx Bridge, Pacific Hall, Streisinger Hall, University Health Services, Volcanology, Willamette Hall, and ZIRC
Scope: CPFM Utilities and Energy will be performing the annual preventative maintenance and an internal inspection of the autoclave steam generator.
Services Impacted:
- The autoclave steam heat exchanger will be shut down.
- Clean steam will be unavailable but chemically treated 60 psi steam will be cross connected and routed through the pipeline for the duration of the shutdown.
- No building heat or hot water will be impacted.
Work Performed By: CPFM Utilities and Energy with a Contractor
Contact: Kyle Wilson, CPFM Utilities Maintenance Manager, 541-346-2246