Computing Center Air Handling Systems Shutdown 10/26/20

Building Impacted:  Computing Center

Scope:  Facilities Services is currently responding to the impacts of the recent fire/smoke event.  As a result, all building air handling systems will be taken off-line, cleaned and all filters replaced.

Begin:  Monday, October 26th, 2020 at 8:00 am

End:      Monday, October 26th, 2020 at 3:00 pm

Services Impacted:  This will affect the building’s cooling, cooling tower, heating, and HVAC air supply.

Extra Notes:  Attached is the link to the original campus wide emergency HVAC filter replacement project notice  https://blogs.uoregon.edu/cpfmnotifications/2020/09/21/campus-wide-hvac-filter-replacement/

Work Performed By:   UO CPFM Facilities Services

ContactKen Straw, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

CPFM Warehouse and Shops Air Handler/Ducting Installation Advisory 10/19/20 – 12/15/20

Building or Area Impacted:  CPFM Warehouse and Shops

Scope:  An air handler/ducting installation project.

Project Duration:  Monday, October 19th, 2020 through Tuesday, December 15th, 2020

Scope Specific to Monday 10/19/20 from 8:00 am to 5:00 pm:  Large HVAC equipment will be lifted up onto the platform above the restrooms.

Services Impacted on Monday 10/19/20:  The following areas will be intermittently inaccessible due to overhead work:

  • Warehouse breezeway (H109)
  • Open workspace (room 116)
  • Restrooms (118, 117A, 117B, 117C, 117D, and 118)

Work Performed By:   Preferred Construction and Hydro-Temp

ContactTim Allenbaugh, CPFM Project Manager, 541-346-8214

Custodial Notification re: Cleaning of Laboratories

Recent shifts in the Custodial department’s responsibilities, in response to Covid19 and an abnormally high vacancy rate, has resulted in the Facilities Services Custodial group experiencing heavier workloads than normal. Due to these circumstances, Custodial Services will not be entering research lab spaces to sweep floors and empty trash.  Until this situation improves and future custodial service levels across campus are defined, please place your garbage receptacles and floor sweepings outside of your lab(s), preferably in the hallway, for our staff to attend to as part of our normal routes.

Facilities’ Custodial Services will continue to clean offices on a monthly basis and common spaces each day (restrooms, hallways, lobbies, stairways, scheduled teaching spaces, high-touch surfaces, etc.).

If you have an urgent issue, please contact the Work Control Center.

Sorry for any inconvenience this may have caused, and please let us know if there is anything else we can help you with.