University Health, Counseling, and Testing Center Electrical Shutdown 8/25/20 and Retest 9/3/20

RETEST DATE CONFIRMATION:

As originally scheduled, the retest will be conducted on Thursday, September 3, 2020, between 6:00 am and 6:30 am.

 

Begin:  Tuesday, August 25th, 2020 at 6:00 am

End:      Tuesday, August 25th, 2020 at 6:30 am

Retest Begin:  Thursday, September 3rd, 2020 at 6:00 am

Retest End:      Thursday, September 3rd, 2020 at 6:30 am

Building(s) or Area(s) Impacted:  University Health, Counseling, and Testing Center

Scope:  To demonstrate that emergency egress lighting and signs operate during a power loss event, building power will be transferred from normal power to stand-by. The shutdown will be scheduled for 8/25 with a 2nd retest scheduled for 9/3 at the same start and stop time, if required.

Services Impacted:  Electricity throughout the building

Special Instructions:  Please shut down all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when power is turned back on, a power surge can corrupt the clone files in the machines, and can change preconfigured settings.

Work Performed By:   UO CPFM Facility Services and Lease Crutcher Lewis

ContactColin Brennan, CPFM Owner’s Representative, 541-346-8242 or 541-654-2972