Begin: Tuesday, August 4, 2020 at 2:30 pm
End: Tuesday, August 4, 2020 at 3:00 pm
Building(s) or Area(s) Impacted: Streisinger Hall 2nd and 3rd floors
Scope: The general air supply to the 2nd and 3rd floors will be shut down to correct a faulty air temperature sensor causing operating issues and various RENO alarms.
Services Impacted: 2nd and 3rd floor air supply
Extra Notes: Disruption should be minimal and occupants will most likely not notice the outage. Fume hoods will be operational during outage.
Work Performed By: CPFM Building Automated Systems Shop
Contact: Stacy Breaux, CPFM FS Electrical/Control System Tech, 541-521-5376