Huestis Fire Alarm Testing 8/11

Begin:  Tuesday, August 11, 2020 at 7:00 am

End:      Tuesday, August 11, 2020 at 8:00 am

Building(s) or Area(s) Impacted: Huestis

Scope: The UO Fire Marshal office in conjunction with CPFM staff will be testing the Huestis fire alarm in order to verify fire alarm / HVAC interface.

Extra Notes: Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time.  Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures. If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By: UO Fire Marshall and CPFM Facilities Services

Contact: Simon Ditton, Fire Systems Program Manager, 541-346-2958

LISB First Floor Fire Testing 8/18

Begin:  Tuesday, August 18, 2020 at 7:00 am

End:      Tuesday, August 18, 2020 at 8:00 am

Building(s) or Area(s) Impacted: Lewis Integrated Science Building 1st Floor

Scope: Contractors will be testing the new fire alarm and strobe system as part of the LCNI MRI renovation project.

Extra Notes: Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time.  Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures. If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations. Please contact Zach Earl, Fire Systems Program Manager, 541-346-9295 (Office) or 541-521-0351 (Mobile) with questions.

Work Performed By: GBC Construction

Contact: Martina Oxoby, CPFM Owner’s Representative, 541-346-5880

 

Streisinger Hall 2nd & 3rd Floors Air Supply Shutdown 8/4

Begin:  Tuesday, August 4, 2020 at 2:30 pm

End:      Tuesday, August 4, 2020 at 3:00 pm

Building(s) or Area(s) Impacted: Streisinger Hall 2nd and 3rd floors

Scope: The general air supply to the 2nd and 3rd floors will be shut down to correct a faulty air temperature sensor causing operating issues and various RENO alarms.

Services Impacted: 2nd and 3rd floor air supply

Extra Notes: Disruption should be minimal and occupants will most likely not notice the outage. Fume hoods will be operational during outage.

Work Performed By: CPFM Building Automated Systems Shop

Contact: Stacy Breaux, CPFM FS Electrical/Control System Tech, 541-521-5376

Lokey ED Access Systems Offline 8/4

Begin:  Tuesday, August 4, 2020 at 12:52 pm

End:      Unknown

Building(s) or Area(s) Impacted: Lokey Education Addition C Building

Scope: Access control systems at one of the education addition buildings (Lokey ED Complex – 041) are offline and not functioning.

Services Impacted: Both the east and west sides of the building are down.

Work Performed By: CPFM Access Control Shop and Contractors

Contact: Kirk Gilbert, CPFM Electrical/Control System Technician, 541-346-2385