Knight Library and Gerlinger Annex Access Advisory 5/27/20

Begin: Wednesday, May 27th, 2020 at 6:30 am

End: Wednesday, May 27th, 2020 at 9:00 am

Buildings or Areas Impacted: Knight Library and Gerlinger Annex

Scope: Contractors will have a boom truck (mobile crane) between Gerlinger Annex and Knight Library. This is part of a platform installation on the roof of Knight library.

Services Impacted: Access between Gerlinger Annex, Knight Library and the Cemetery will be closed during this time.

Work Performed By: S2 Industrial

Contact: Jeff Madsen, CPFM Asst. Dir Engineer Utility Systems, 541-346-2256

13th Ave, Fenton Hall, and Friendly Hall Sidewalk Pressure Washing 5/19/20 – 5/22/20

Begin: Tuesday, May 19th, 2020 at 5:00 am

End: Friday, May 22nd, 2020 at 4:00 pm

Buildings or Areas Impacted: Fenton Hall and Friendly Hall

Scope: Over the next three days, CPFM staff will be pressure washing along 13th Ave from Kincaid Street to University Street on the North and South sides of the sidewalk.  They will also be pressure washing the East entrance to Fenton Hall, the entrances to Friendly Hall, and along the West and South sides of Friendly.

Services Impacted:

  • Access to the ADA ramps to buildings will be open, but there will be hoses and equipment that may need to be moved in order to access them.  Please use an alternative entrance, if possible.

Work Performed By: CPFM Zero Waste & Garbage Services Staff

Contact: Donny Addison, CPFM Zero Waste Solid Waste Manager, 541-346-0961