CPFM Warehouse Walk-through Meeting Advisory 5/20/20

Begin:  Wednesday, May 20th, 2020 at 2:30 pm

End:      Wednesday, May 20th, 2020 at 3:30 pm

Building(s) or Area(s) Impacted:  CPFM Warehouse and Shops (Bldg. 130)

Scope:  A small group of contractors will be meeting at the CPFM warehouse on Wednesday for a pre-bid walk-through. This meeting is for the new first floor Air Handler Unit and ducting project.

Extra Notes:  Contractors do have a virtual-meeting option. Those that show up in person, will be asked to respect CDC social distancing guidelines.

ContactTim Allenbaugh, CPFM Project Manager, 541-346-8214

Huestis Hall Exhaust System Shutdown 6/8/20 – 6/10/20

2nd UPDATE 6/11/20 3:11 pm:  The fans are back up and running normally.

 

UPDATE:

The fan is currently running under test mode, but the system is NOT operational at this time.  Testing will continue tomorrow, with the possibility that the shutdown may extend into Thursday.  A notice will be sent when the system is back up and running.

 

Begin:  Monday, June 8th, 2020 at 7:00 am

End:      Wednesday, June 10th, 2020 at 5:00 pm

Building or Area Impacted:  Huestis Hall

Scope:  Replace failed Lab Exhaust Fan controls.

Services Impacted:

  • This shutdown will disable the lab exhaust air for all fume hoods in the building.
  • There will be intermittent interruptions to the building general exhaust system as well, including the Cage Wash exhaust.

Special InstructionsAll fume hoods should be closed and the containers in the fume hoods sealed prior to Monday morning 6/8/20.

Work Performed By:   SIEMENS

ContactStacy Breaux, CPFM FS Electrical/Control System Tech, 541-521-5376