DESIGO System Server Shutdown 2/18/2020 – 2/21/2020

Begin:  Tuesday, February 18th, 2020 at 8:00 am

End:      Friday, February 21st, 2020 at 5:30 pm

Buildings or Areas Impacted:

Berwick Hall
Chapman Hall
Gerlinger Hall
HEDCO Education
Klamath Hall
Pacific Hall (RENO Alarming for the Pacific 17 Freezer Farm and the freezers in Pacific rooms 114 and 222)
Price Science Commons
Tykeson Hall

Scope:  The DESIGO System Server will be shut down, but all of the buildings will continue to operate on the program that is stored in the local BAS panel.

Services Impacted:  Users with remote access will not have visibility to the DESIGO Front End during the shutdown.  RENO will be down for the buildings listed until it can be verified and rebuilt as needed on 2/20/20.  Building users should not notice any impacts.

Extra Notes:  Work will be performed by SIEMENS.

Contact:  Stacy Breaux, CPFM FS Electrical/Control System Tech, 541-521-5376

ROTC LERC Exterior Window Washing 2/14/2020 – 2/16/2020

Begin:  Friday, February 14th, 2020

End:     Sunday, February 16th, 2020

Building Impacted:  ROTC LERC

Scope:  The exterior windows will be washed.

Services Impacted:  Due to the use of the lift, the walkways may be partially blocked, but will not interfere with ADA entrances.

Extra Notes:  Work will be performed by DDJ.

Special Instructions:   Please close all exterior windows on these dates.

Contact:  Kevin Farthing at 541-359-6633 or kfarthin@uoregon.edu

Klamath Hall Steam Shutdown 2/14/2020

Begin:   Friday, February 14th, 2020 at 5:00 am

End:      Friday, February 14th, 2020 at 3:00 pm

Building or Area Impacted:  Klamath Hall

Scope:  Klamath 3rd floor renovation needs to safely isolate steam lines.

Services Impacted:  Steam for the entire building will be offline.  This work will not impact clean steam.

Work Performed By:  Lease Crutcher Lewis

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Klamath Hall 3rd Floor RO and Safety Shower Station Shutdown 2/13/2020

UPDATE:  The only safety shower impacted will be room 345.  The 3rd floor RO will still be offline from 9:00 to 3:00 as planned.

 

Begin:   Thursday, February 13th, 2020 at 9:00 am

End:      Thursday, February 13th, 2020 at 3:00 pm

Building or Area Impacted:  Klamath Hall

Scope:  Klamath 3rd floor renovation needs to reroute and isolate the RO water and safety showers stations.

Services Impacted:  RO will be offline on the 3rd floor and the only safety shower impacted will be in room 345.

Work Performed By:  Lease Crutcher Lewis

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Klamath Hall 2nd Floor Nitrogen Shutdown 2/13/2020

Begin:   Thursday, February 13th, 2020 at 5:00 am

End:      Thursday, February 13th, 2020 at 8:00 am

Building or Area Impacted:  Klamath Hall

Scope:  Klamath 2nd floor renovation needs to reroute and isolate nitrogen lines.

Services Impacted:  Only the 2nd floor nitrogen lines will be offline.

Work Performed By:  Lease Crutcher Lewis

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Klamath Hall Compressed Air Shutdown 2/12/2020

Begin:   Wednesday, February 12th, 2020 at 5:00 am

End:      Wednesday, February 12th, 2020 at 11:00 am

Building or Area Impacted:  Klamath Hall

Scope:  Klamath 3rd floor renovation needs to reroute and isolate the compressed air.

Services Impacted:  High pressure (100 lb.) and low pressure (30 lb.) compressed air with be offline.

Extra Notes:  Temporary compressors can be provided for critical equipment.

Work Performed By:  Lease Crutcher Lewis

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258