Klamath Hall Steam Shutdown 10/24/19 – 10/25/19

On Thursday evening, October 24th at 7:00 pm, until Friday morning, October 25th at 7:00 am, steam (not clean steam) will be offline in order to modify steam and condensate piping for connecting to the 3rd floor renovation.  Heating water temperatures will likely be reduced until the steam is restored, at which time the temperatures will return to normal.

Temporary heaters will be supplied to controlled temperature rooms.

Work will be performed by Lease Crutcher Lewis.

For questions or concerns, please contact Denise Stewart at 541-335-1258 or dstewart@uoregon.edu.

 

 

Streisinger Room 266 Mold Clean Up Notice

Belfor will be conducting a cleaning in Streisinger 266 tomorrow starting at 8:30 AM. We anticipate the work will take all day. Belfor will clean all surfaces with an approved disinfectant and an air scrubber. EHS will inspect and approve upon completion. We have had minimal time to plan and set this up, so we may have to make adjustments on the fly once we get started. Should Belfor need ventilation to complete the work, we’ll have to work with them to find a way to get that set up. Hopefully this will not be necessary.

After cleaning has been finished, EHS will treat the space with our ozone generator.  Ozone treatment will occur on Thursday evening and again on Friday evening. Room 266 will be off limits until Monday morning, with signage on the door barring entry.

Please contact me (Adam Jones 346-8397 asjones@uoregon.edu) if you have any questions.

Fenton Hall Exterior Window Washing 10/10/19 – 10/11/19

On Thursday, October 10th through Friday, October 11th, the exterior windows will be washed at Fenton Hall.  Due to the use of the lift, the walkways will be partially blocked, but will not interfere with ADA entrances.

Please close all exterior windows on these dates.

For questions or concerns, please contact Kevin Farthing at 346-2857 or kfarthin@uoregon.edu.

Willamette Hall RO Water and Gas Shutdown 10/16/19 – 10/17/19

On Wednesday evening, October 16th at 10:30 pm to Thursday morning, October 17th at 4:30 am, the RO water in the basement will be shutdown, plus the natural gas, for the whole building, will be offline.  This will allow the contractor to isolate the RO water and natural gas utilities for renovation in the basement.

Work will be performed by Lease Crutcher Lewis.

For questions or concerns, please contact Denise Stewart at 541-335-1258 or dstewart@uoregon.edu.