Franklin Blvd Golf Carts and Grounds Equipment Crossing 8/16/19 – 8/19/19

All Operators of Golf Carts or Grounds Equipment,

Due to construction, operators need to use Agate Street as a crossing for Franklin Boulevard.  Agate Street can be accessed by going out the back gate of CPFM compound.  NO Golf Carts or Equipment can be driven on Franklin Blvd. – Crossing Only

If you have any questions or concerns, please contact Scot Campbell at 346-2300 or scambel@uoregon.edu.

Per notice from 8/12/19

Parking Closures 8/16 – 8/19

Parking Lots 12A and 12B will be closed. Pedestrian, bike and cart detours will be in place as shown on the attached map.  Lots are closed to allow for placement and use of a 500-ton crane that will set supply air units and exhaust fans onto the Klamath Hall rooftop. Friday, August 16th will be used to set up the crane with a second crane. Saturday, August 17th and Sunday, August 18th will be used to crane equipment from trucks in lot 12A onto the Klamath Hall rooftop. Monday, August 19th will be used to take down the crane with a second crane.

 

Susan Campbell Hall Fire Alarm Testing 8/20/19

University Fire Systems personnel will conduct a brief fire alarm test tomorrow morning, August 20, around 6 a.m.

Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time.  Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

For questions or concerns, please contact Fire Systems Program Manager Zach Earl at 541-521-0351 or 541-346- 9295.

Millrace Studio 3 Planned Heat and Hot Water Shutdown 8/26 – 9/6/19

Update 9/5/19:

This project has been extended by three days and is expected to be completed on 9/6/19 after the power is connected to the new water heater.

 

Beginning Monday, August 26, at 8 a.m., Facilities Services technicians will shut off all heat and domestic hot water to Millrace Studio 3 while they perform planned repairs. Technicians will restore both heat and hot water services by Tuesday Friday, September 3 6.

CPFM Facilities Services technicians will complete this work.

Please refer any questions or concerns to CPFM Work Control Center at 541-346-2319.

 

 

Knight Library L205, 206, and 206A Renovation Advisory 8/19 – 9/27/19 – UPDATE

UPDATE:

Beginning, Monday, August 19 through September 27, CPFM Construction Services Design and Construction will be renovating Knight Library Special Collections Rooms 205 and 206 L205, 206, and 206A. This work involves demo, electrical, carpentry, paint, new carpet, and furniture. Building users can expect to hear normal and occasional construction noises, such as hammering and drilling; in addition, during the paint portion, occupants may notice a faint smell from the low-VOC, non-toxic paint. Contractors and UO personnel will be entering/exiting the building with tools and materials during normal business hours.

Asbestos abatement is planned for August 21-23. During this time, technicians will turn off HVAC ventilation system as part of normal safety precautions, which will affect portions of Floors 1 and 2, as well as the basement. No other utility disruptions or shutoffs are expected at this time; however, additional notice(s) will be distributed, should any occur.

Preferred Construction will perform this renovation work.

For any questions or concerns, please contact Project Manager Theo Davis at 541-346-1012 or tdavis1@uoregon.edu.

ORIGINAL MESSAGE:

Beginning, Monday, August 19 through September 27, CPFM Construction Services will be renovating Knight Library Special Collections Rooms 205 and 206.  This work involves demo, electrical, carpentry, paint, new carpet, and furniture. Building users can expect to hear normal and occasional construction noises, such as hammering and drilling; in addition, during the paint portion, occupants may notice a faint smell from the low-VOC, non-toxic paint. Contractors and UO personnel will be entering/exiting the building with tools and materials during normal business hours.

Asbestos abatement is planned for August 21-23. During this time, technicians will turn off HVAC ventilation system as part of normal safety precautions, which will affect portions of Floors 1 and 2, as well as the basement. No other utility disruptions or shutoffs are expected at this time; however, additional notice(s) will be distributed, should any occur.

Preferred Construction will perform this renovation work.

For any questions or concerns, please contact Project Manager Theo Davis at 541-346-1012 or tdavis1@uoregon.edu.

Tykeson Hall Waste/Recycling Room Opens August 19

The new waste and recycling room in Tykeson Hall opens Monday, August 19. This site will be the centralized location for all waste, cardboard, and recycling material generated from building occupants in Tykeson Hall, Chapman Hall, Fenton Hall, Johnson Hall, and Collier House. This room is located on the southeast side of Tykeson (see map below).

Occupants of these five buildings will need card access to enter this room for disposing waste and recycling material. To request access, authorized department requestors are asked to send a spreadsheet with all employee information from their department to keyaccess@uoregon.edu. Attaining card access is imperative because this room will be locked 24/7 to deter unauthorized individuals from accessing the site.

Waste and cardboard dumpsters temporarily located in front of Johnson Hall on 13th Avenue will remain until Friday, September 13, and will be removed on Monday, September 16.

Please contact Donny Addison with any questions or concerns at 541-346-0961 or addisdt@uoregon.edu.

 

Frohnmayer Music Building 121A and Lobby 120 Renovation Advisory 8/19 – 9/6/19

Update 8/30/19:

This renovation work has been extended a week and is expected to be completed on September 6th.

 

Beginning, Monday, August 19 through August 30 September 6th, CPFM Construction Services will be doing a minor renovation project in Room 121A and Lobby 120 in the Frohnmayer Music Building. This work involves demo, minor abatement of base, framing, door install, drywall, patching, and painting. Building users can expect to hear normal and occasional construction noises, such as hammering and drilling; in addition, during the paint portion, occupants may notice a faint smell from the low-VOC, non-toxic paint. Occupants may also notice UO personnel entering/exiting the building with tools and materials during normal business hours.

No other utility disruptions or shutoffs are expected at this time; however, additional notice(s) will be distributed, should any occur.

UO CPFM Facilities Services will perform the entire renovation.

For any questions or concerns, please contact Project Manager Theo Davis at 541-346-1012 or tdavis1@uoregon.edu.

Huestis Hall Planned Industrial Water Shutdown 8/27/19

Backflow assembly repairs on Tuesday, August 27 from 8 – 10 a.m., will require shutting down all industrial water to lab sinks (including hot water), auto claves, cage washers, and flue hoods during this two-hour period. Domestic hot and cold water will operate normally throughout the building, so building occupants will not be impacted.

CPFM plumbers will perform this work.

Please direct any questions or concerns to Work Control Center at 541-346-2319.

Thompson University Center Planned Domestic Hot Water Shutdown 8/22/19

On Thursday, August 22 from 10 a.m. – 3:30 p.m., domestic hot water in Thompson University Center will be shut off while Facilities Services replaces a recirculation pump. This will impact all bathroom and break room sinks in the building, as they will have no hot water while plumbers replace the pump.

CPFM plumbers will perform this work.

Please direct questions or concerns to Work Control Center at 541-346-2319.

Thompson University Center is located at 720 E. 13th Ave.

 

University Health, Counseling, and Testing Center Planned HVAC Shutdown 9/10 – 9/13/19

Between September 10 and 13, heating and cooling will not be available in specific areas of the University Health Center, while Facilities Services replaces two air handling units (AHUs).  AHU 1 and 2 will be offline September 12-13 and 10-11, respectively. The color-coded exhibit below shows which areas in the building will be impacted during each shutdown. Project technicians will take steps to make the spaces as comfortable as possible during this period and will be particularly attentive to addressing critical areas.

Lease Crutcher Lewis will perform the work.

Please contact Owner’s Representative Colin Brennan with questions or concerns at 541-654-2972 or brennan@uoregon.edu

 

                                       

 

REVISED: Allen Hall First-Floor Fire Sprinkler Shutdown 8/22/19

REVISED:

The sub-contractor was not able to perform work that was scheduled for this morning, as described below.  They plan to do the work tomorrow, August 22nd, during a modified time frame of 6:00 am -12:00 pm. 

 

Please share with building occupants

Facilities Liaisons,

On Wednesday, August 21 from 10 a.m. – 12 p.m. Thursday, August 22 from 6:00 a.m. – 12:00 p.m., upgrades will be made to the fire sprinkler system at Allen Hall, impacting the first floor only. This work is associated with the SOJC Experience Hub Remodel project and involves incorporating whips to part of the system.

Horns, Strobes, and Speakers on the fire alarm system will not sound during the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

For questions or concerns about this shutdown, please contact Owner’s Representative Gene Mowery at 541-346-5593 or gmowery@uoregon.edu.

 

 

Klamath Hall Lamp Change-Out Week of August 19

Our electrical crew will be changing out lamps in Klamath Hall the week of August 19. Advance notice was sent to Facilities Liaisons on July 31 for scheduling access to the laser labs, or any lab, that may present a danger to us or to their equipment.

Here is a schedule of the labs that replied to the email.

8/19/19

  1. Klamath Hall Rm.   45
  2. Klamath Hall Rm. 109
  3. Klamath Hall Rm. 115

8/20/19

  1. Klamath Hall Rm. 118
  2. Klamath Hall Rm. 120
  3. Klamath Hall Rm. 124
  4. Klamath Hall Rm. 174

8/21/19

  1. Klamath Hall Rm. 121
  2. Klamath Hall Rm. 127
  3. Klamath Hall Rm.  60  (Work to begin at 11 a.m.)
  4. Klamath Hall Rm. 344 (Work to follow after completing Rm. 60)

8/22/19

  1. Klamath Hall Rm. B48
  2. Klamath Hall Rm. B84
  3. Klamath Hall Rm.  108
  4. Klamath Hall Rm.  132

 

We are assuming that the labs that didn’t respond have not access concerns, so we will enter these spaces when we are in the area to complete our work.

If you have any questions or concerns, please contact Ernie Dangerfield at 346-2805 or erniemd@uoregon.edu.

Vivian Olum Child Development Center Room 103 Renovation 8/26/19 – 8/30/19

From Monday, August 26 through Friday, August 30, Facilities Services will renovate Room 103 in the Vivian Olum Child Development Center. Renovations involve carpentry and plumbing work to modify the height of the cabinet and sink. Occupants can expect to hear normal and occasional construction noises, such as drilling and cutting, and may observe UO Facilities personnel entering/exiting the building with tools and materials during regular business hours.

At this time, Facilities Services anticipates no utility disruptions or shutoffs; however, Facilities Services will provide additional notice(s) should any services unexpectedly be disrupted or shut down.

Please contact Justin Grishkin with questions or concerns at 541-346-5242 or jgrishki@uoregon.edu.

REMINDER: Autzen Complex Fire Alarm and Sprinkler Testing 8/13/19 – 8/14/19

Starting June 18 through August 14, Fire and Life Safety has scheduled Fire Alarm and Sprinkler testing in various buildings campus-wide.

The Autzen Complex is scheduled for two days of testing on August 13th and 14th .

https://blogs.uoregon.edu/cpfmnotifications/2019/06/06/summer-fire-alarm-and-sprinkler-testing-schedule-6-18-8-14/

Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

For questions or concerns, please contact Fire Systems Program Manager Zach Earl at 541-521-0351 or 541-346-9295.

Willamette Hall Lamp Change Out Week of August 12th

Our electrical crew will be changing out lamps in Willamette Hall the week of August 12th. Advance notice was sent to Facilities Liaisons on July 31st for scheduling access to the laser labs, or any lab, that may present a danger to us, or to their equipment.

Here is a schedule of the labs that replied to the email.

8/13/19

  1. Willamette Hall Rm. 363
  2. Willamette Hall Rm. 171 and 171A

8/16/19

  1. Willamette Hall Rm. B32
  2. Willamette Hall Rm. 209
  3. Willamette Hall Rm. 210

We are assuming that the labs that didn’t respond do not have access concerns, so we will enter them to do our work, when we are in the area.

If you have any questions or concerns, please contact Ernie Dangerfield at 346-2805 or erniemd@uoregon.edu.

Klamath Hall Men’s Ground Floor Restroom #080 Advisory 8/12/19 – 8/23/19

Beginning Monday, August 12th through Friday, August 23rd, the men’s toilet in room #080 will have been temporarily removed to allow plumbers to access and revise waste piping.  Urinals will remain in place.

Work will be performed by Lease Crutcher Lewis.

For questions or concerns, please contact Denise Stewart at 541-335-1258 or dstewart@uoregon.edu.

 

 

ZEBRAFISH Compressed Air Shutdown 8/8/19

On Thursday, August 8th, from 7:00 am to 3:00 pm, the compressed air system in the utility tunnel will be shut down for re-routing as part of the Knight Campus Project.  The branch from the central plant to the Knight Campus site will be taken out of service, while all other locations will remain operational.  This work will take place in the tunnel.

Work will be performed by S2.

For questions or concerns, please contact Jeff Madsen at 346-2256 or jmadsen@uoregon.edu.

HEDCO Electrical Shutdown 8/31

On Saturday, August 31, CPFM Utilities and Energy will be coordinating a contractor to work on the transformer that services HEDCO.  This will require a building-wide electrical shutdown.  The electrical shutdown will begin at 9:00 am and will last approximately 6 hours.  The crew will remain on-site one hour after energizing.

 

Scope of work. Crews will de-energize the transformer and drain out the oil so the oil sampling port can be replaced.  After that, the oil will be added and then monitored for leaks to let the air bubbles rise before crews can energize. Air bubbles in the oil can cause electrical arcing inside. Crews test the oil, so they can see how the transformer is doing and predict what maintenance can/should be done to extend the life of the transformer.

 

This work was pre-coordinated with Facilities Liaison Eric Owens.

 

For questions or concerns, please contact:

 

Rick Tabor

University of Oregon

Utilities and Energy Electrical Superintendent

Campus Planning and Facilities Management

541-346-7511

CPFM Warehouse & Shop (Bldg 130) Noise Advisory and Heating Shutdown 8/12/19 – 8/19/19

Beginning Monday, August 12th at 7:00 am until Monday, August 19th at 4:00 pm, Facilities Services will be removing a number of abandoned pipes and equipment from Mechanical room #226A.  The heating system will also be shut down during this time.

The activities inside the room will be very loud as pipes are cut in place and extracted.  The noise will likely be heard throughout the building.

Additionally, a section in the fleet parking area, just south of the building, will be marked off where a forklift will be parked to take away the debris from the second story.

For questions or concerns, please contact Tim Allenbaugh at 346-8214 or timallen@uoregon.edu.

 

Lillis Hall Electrical Shutdown 8/20/19

CPFM Utilities and Energy have scheduled an electrical shutdown on August 20th from 4:00 am – 6:30 am at Lillis Hall to add new hardware for electrical metering.  This is part of the campus energy management campaign to capture energy use on campus.  Advance notice was sent to Facilities Liaisons on July 25th.

This will impact:

BEW4, BNW2, PSW2, 2SW2, 3SW2, BSE2, 3SE2, SWB ,PSE2, BSW2

Impact to phones, network, and card reader access:

  • Phone:   Analog phones run off the phone cabinet on DC power in the 2nd floor closet, so they should stay up.  (analog sets would include elevator phones, emergency phones, analog courtesy phones, black desk phones, fax, etc.) IP sets on folks’ desks may or may not stay up / working depending on network
  • Network:   The gateway is in the D closet 3rd floor, it’s on a UPS, and may ride out any outage.  Edge switches will be a mix, some are on electrical circuits that are not affected so will stay up, some will go down.
    Private network gateway appears to be on an affected circuit and as such will go down for the duration of the outage.
  • Building Access: There will be a controlled power shut down/power up of this system.  The main south entrance will be manned to allow access as none of the card readers in the building will be operational during this time.

Other impacted areas/equipment:

  • AHU6 Supply/Return
  • Mechanical room outlets
  • Reception outlets
  • Lighting utility
  • Room 51
  • Tunnel lighting
  • Heat meters
  • Elevator 2 lights
  • Elevator mechanical room outlet/lights
  • Elevator pit lights
  • EF-8 Fan
  • East/West Atrium outlets
  • CP-35
  • CP-31
  • CP-21
  • WH-1
  • WH-CP
  • Tunnel sump pump

For questions and concerns, please contact CPFM UE Electrical Superintendent Rick Tabor at 541-346-7511 or rtabor@uoregon.edu.

Friendly 109 & 217 access work for future elevator project 8/10 – 8/11

Facilities Liaisons,

In order to facilitate the structural design of the new elevator scheduled to be constructed in summer 2020 in Friendly Hall, we need to cut an access hole in the ceiling of rooms 109 and 217. This work needs to be done before 8/13 to maintain the design schedule. I am trying to schedule an asbestos contractor to do this work. I am hoping to schedule this for the coming weekend 8/10 or 8/11.

These rooms will be usable when we are finished with this work. Some ceiling tiles will need to be replaced in conference room 109. I am working to determine if we have any stock on-site or if replacement tiles need to be ordered.

Pre-communication was sent to Cathy Soutar.

I apologize for the short notice but and appreciate your patience.

Bruce Budzik
Small Projects Manager CPFM Design and Construction
bbbudzik@uoregon.edu | 541-346-8834

Onyx Bridge Electrical Shutdown 8/15/19

CPFM Utilities and Energy have scheduled an electrical shutdown on August 15 from 5:00 am – 6:30 am at Onyx Bridge to add new hardware for electrical metering.  This is part of the campus energy management campaign to capture energy use on campus.  Advance notice was sent to Facilities Liaisons and PI’s on July 25 and no feedback was received.

This will impact:

Electrical Panel EBA

  • Tunnel lights
  • Hot Water Re-Cir
  • Room 68 East Wall
  • SU1
  • P-2
  • EF1
  • CP1

Electrical Panel EBD

  • Siemens MBC
  • Room 78
  • Electrical Meter
  • Air Conditioner

For questions and concerns, please contact CPFM UE Electrical Superintendent Rick Tabor at 541-346-7511 or rtabor@uoregon.edu.

Ford Alumni Center Room 109 Audio/Video Upgrade Project 8/19 – 9/6

UPDATE 9/6:

This upgrade project has been extended by one week and the expected completion date is 9/6/19.

 

The contractor, Diversified, will be upgrading the Audio/Video in Ford Alumni Center’s Giustina Ballroom (room 109) from August 19th through August 30th September 6th. The work involves audio and video infrastructure and equipment work. Users can expect to hear normal and occasional construction noises such as hammering and drilling. Users might also see the contractor and UO personnel entering/exiting the building with tools and materials during regular business hours. No utility disruptions or shutoffs are expected at this time, but if there are any, then an additional notice will be distributed.

If there are any issues, please contact:

Theo Davis | Project Manager p: 541.346.1012
mailto:tdavis1@uoregon.edu
Office of Design & Construction | Campus Planning & Facilities Management