Huestis Hall Planned Industrial Water Shutdown 8/27/19

Backflow assembly repairs on Tuesday, August 27 from 8 – 10 a.m., will require shutting down all industrial water to lab sinks (including hot water), auto claves, cage washers, and flue hoods during this two-hour period. Domestic hot and cold water will operate normally throughout the building, so building occupants will not be impacted.

CPFM plumbers will perform this work.

Please direct any questions or concerns to Work Control Center at 541-346-2319.