Facilities Liaisons,
Ryan Thomas Construction will be renovating Streisinger Lab 365 starting on August 5 and continuing through the end of September. Work will include minor demolition, new casework and painting. Surrounding occupants can expect to hear occasional construction noises such as hammering and drilling. No utility disruptions or shutdowns are expected at this time. The scope of work should not introduce any vibration to the floor. If there are any necessary disruptions or shutdowns to services, an additional notice will be distributed.
Contact: CPFM Design and Construction Owners Rep Martina Oxoby 541-346-5880.