Onyx Bridge West Elevator Shutdown 7/1 – 9/15

Facilities Liaisons,

As part of the elevator modernization project,  Onyx West Elevator off the loading dock will be shut down from July 1st through September 15th.  There will be increased contractor activity and noise associated with this work. During this time frame, please use the east elevator for access.

For questions or concerns please contact CPFM Design and Construction Project Manager Bruce Budzik at 346-8834.