Oregon Hall Freight Elevator Shutdown 4/16

Campus Community,

This summer CPFM will be replacing the Oregon Hall Freight Elevator (north elevator near the loading dock). On 4/16 our elevator contractor needs to take field measurements in the elevator pit. The elevator will be off-line from 9AM-11AM for this activity. The 2 main passenger elevators (south lobby) will not be impacted by this activity and will remain in service. If you have any questions or concerns, please contact Design & Construction Owner’s Representative Patrick Mucker at 541-346-8216.