McKenzie Hall HVAC Shutdown, Floors 2, 3, and 4 North Side 3/27-3/28

Campus Community,

Beginning March 27, 2019 at 7:00a, the HVAC system in McKenzie Hall serving the north side of floors 2, 3, and 4 will be shut down to replace the failing Siemens building controls panel, along with the corresponding linked systems in the related air handlers associated with it. This shutdown will continue through 3:30p on March 28, 2019. Users may experience lower than normal temperatures throughout this shutdown. If you have questions or concerns, please contact CPFM’s Electrical Control System Technician Stacy Breaux at 541-346-2319.