University Health, Counseling, & Testing Center Construction Crane Activities

Building Occupants,

On Saturday, 1/12/19, there will be a crane delivery at the University Health, Counseling, & Testing Center to support the on-going Expansion & Renovation Project. The crane will be located within the current construction fence per the attached drawing. On Monday, 1/14/19, the project will begin receiving steel deliveries and erecting the steel structure. Steel activities will continue for several weeks. All steel deliveries will enter the construction area before being unloaded. Steel deliveries will cause some minor traffic disruptions to 13th Ave at Beech Street. Lease Crutcher Lewis will manage these activities and use flaggers to assist with deliveries. The south sidewalk of 13th Ave, adjacent to the Health, Counseling, & Testing Center is closed. Pedestrians should observe the signage and use the north sidewalk along 13th Ave. (adjacent to Oregon Hall) and avoid walking in the street along the construction fence.

For questions or concerns please contact CPFM Design and Construction Owners Representative Patrick Mucker at 541-346-8216.

[embeddoc url=”https://blogs.uoregon.edu/cpfmnotifications/files/2019/01/UHCTC-Crane-Location-01.10.19-1toti3h.pdf” download=”all” viewer=”google” ]