Geotechnical Investigations Advisory 9/26 – 9/28

Campus Community,

Design and Construction will be conducting geotechnical investigations related to the new residence halls project from September 26-28. This work will consist of a drill rig taking boring samples for soils analysis at the locations noted in the drawing. Impacted areas will be locations around Hamilton Hall, Walton Hall, and the Humpy Lumpy Lawn area.

Mobilization and drilling activity will start at 9 AM each of the three days.

For questions or concerns please contact CPFM Design and Construction Manager George Bleekman at 541-346-2625.

[embeddoc url=”https://blogs.uoregon.edu/cpfmnotifications/files/2018/09/Boring-locations-u3t40f.pdf” download=”all” viewer=”google” ]