3/6 – 3/23: NW Natural Work Zones along Millrace, Fine Arts & ZIRC Impacting Paths of Travel

Campus Community,

As part of the Knight Campus Project, our utility provider NW Natural has requested a series of work zone notifications redirecting pedestrian, bicycle, and vehicular traffic.  Please expect noise and congestion in these work areas.

Zone 1 March 6 – March 9, 2018

Service and emergency vehicle access only.  Service vehicles are encouraged to use alternate routes. Lots 3A and 3B will remain open, but access may be delayed.  Parking in Lot 4 and 56 is encouraged.

[embeddoc url=”https://blogs.uoregon.edu/cpfmnotifications/files/2018/03/Work-Zone-1-qvlj3y.pdf” download=”all” viewer=”google” ]

Zone 2 March 12 – March 23, 2018

Service and emergency vehicle access only.  Service vehicles are encouraged to use alternate routes.  Lots 3A and 3B will remain open, but access may be delayed.  Parking in Lot 4 and 56 is encouraged.

[embeddoc url=”https://blogs.uoregon.edu/cpfmnotifications/files/2018/03/Work-Zone-2-17f6pcw.pdf” download=”all” viewer=”google” ]

Looking ahead:

  • Week of March 6 Design and Construction will be coordinating a NW Natural Gas Shutdown with building occupants
  • Late March parts of Millrace Path will be closed to pedestrian and bike traffic.

[embeddoc url=”https://blogs.uoregon.edu/cpfmnotifications/files/2018/03/Work-Zone-3-1norryg.pdf” download=”all” viewer=”google” ]

For questions or concerns regarding how these activities may impact access to your buildings or research, please contact CPFM Design and Construction Project Civil Engineer Sarah Follett at 541-346-8264.