2/17/18: Oregon Hall 2nd and 4th East Floors Heating Water Shutdown

Building Occupant,

On Saturday, February 17th, from 6:00 am to 3:30 pm, construction activity will shut-down heating water to Oregon Hall 2nd Floor East and 4th Floor East.

The 2nd and 4th floor east areas will be without heat during the shut-down and there will be workers in the space to drain down the heating water system, recharge, and remove air from the system.

This work is required to support the renovations on the 2nd Floor to remove old hydronic piping and add isolation valves in the new 2nd Floor Mechanical Room.

Work will be performed by Fortis Construction / Hydrotemp Mechanical.

For questions or concerns about how this may impact your area, contact Patrick Mucker, Campus Planning and Facilities Management (CPFM) Design and Construction at 346-8216.