5/20/17: Huestis and Lokey Labs Hot and Cold Water Shutdown

Additional Building Occupants Added:  CAMCOR

Industrial hot and cold water plus domestic hot and cold water will also be off during this shutdown in Lokey Labs. Process cooling water and RO water will be unaffected. This was a recent discovery today as a result of an emergency shut down.

Building Occupants,

On Saturday, May 20th, from 8:00 am until 4:00 pm, cold and hot water will be shut down for the entire building of Huestis.

Domestic cold and hot water plus Industrial cold and hot water will be turned off.  This will affect sinks and restroom water during this time.

Work will be performed by CPFM’s Facilities Services and Alliant Systems.

For questions or concerns about how this may impact your area, contact Bruce Budzik, Campus Planning and Facilities Management (CPFM) Zone B Maintenance Manager at 346-8834.

 

5/23/17-8/1/17: Pacific Hall Heating Water Shutdown

Building Occupants,

Beginning May 23, 2017 at 4:00 am until August 1, 2017 at 6:00 pm, the heating water in Pacific Hall will be shut down.

The reason for this request is to permanently remove portions of the hydronic piping, as well as re-routing of piping for radiators that will remain in service.

This will affect the building’s heating water.

Lower Level – complete piping and radiator demo.
1st floor – complete piping and radiator demo.
2nd floor – 6 Labs will remain in service, those within the construction area will be removed.
3rd floor – Radiators on the south end of Pacific Hall will be taken out of service, but will remain in place.

Work will be performed by Andersen Construction & S2 Mechanical.

For questions or concerns about how this may impact your area, contact Jen Miley, Campus Planning and Facilities Management (CPFM) Design and Construction at 346-1530.

5/20/17: Klamath, Price Science Commons, and portions of Onyx Bridge Chilled Water Shutdown

Building Occupants,

On Saturday, May 20th from 7:00 am until 5:00 pm, cooling water for supply air will be off to Klamath Hall, Price Science Commons & Research Library, and Onyx Bridge’s 3rd floor and portions of the 2nd floor.  During the shutdown, spaces may increase in temperature.  The duration is the ‘worst case scenario’.  Crews will work to be complete early.

The exact spaces impacted are: All of Klamath Hall, all of Price Science Commons & Research Library, 3rd floor of Onyx Bridge and newly renovated portions of the 2nd floor containing the conference room and IMB office.

Work will be performed by GBC Construction.

For questions or concerns about how this may impact your area, contact Denise Stewart, Campus Planning and Facilities Management (CPFM) Design and Construction at 346-2280.

5/27/17: Columbia Street and Parking Lot 34C Shutdown for Boulder Placement

Campus Community,

On Saturday, May 27th, from 7:30 am until 4:30 pm, Columbia Street and Parking Lot 34C, from 17th Avenue northward, will be shut down. This will allow the staging of a crane to place large boulders at the New Residence Hall.

The sidewalk on the west side of Columbia Street will remain open but access to Parking Lot 34C (Columbia Street) will be closed, as well as vehicular traffic to the Vivian Olum Child Development Center and the Many Nations Longhouse.

The work will be performed by Walsh Construction.

For questions or concerns about how this may affect your area, contact George Bleekman, Campus Planning and Facilities Management (CPFM) Design and Construction at 346-2625.

 

5/17/17: Lokey Ed West/East plus South and Education Annex HVAC Annual PM Shutdown

Building Occupants,

On Wednesday, May 17th, from 8:00 am – 3:30 pm, preventative maintenance is scheduled  for Lokey Education West/East, Lokey Education South, and Education Annex’s heating, ventilation, and air conditioning (HVAC) equipment.  Building occupants should expect intermittent shutdowns on air handling units and restroom exhaust fans to allow crews to change system filters.

Work will be performed by Campus Planning and Facilities Management (CPFM) Preventative Maintenance Crew.

For questions or concerns about how this may impact your area, contact Jim Cody, Campus Planning and Facilities Management (CPFM) Zone A Maintenance Manager at 346-2302.

5/6/17: 13th Ave Crane Activity in Front of Huestis Hall

Campus Community,

On Saturday, May 6th from 11:00 am until 1:00 pm, there will be a temporary road and sidewalk closure on East 13th Avenue in front of Huestis Hall for crane activities.

There are on-going lab renovations at Huestis Hall that require the use of a crane to place equipment on the roof.

We will allow emergency vehicles through, if required.  Signs will be posted routing pedestrian traffic to the south sidewalk of 13th Ave.

The crane activities will occur after the morning Fun Run and 5K.

For questions or concerns about how this may impact your area, contact Patrick Mucker, Campus Planning and Facilities Management (CPFM) Design and Construction at 346-8216.

5/3/17: Klamath Hall Compressed Air Shutdown

Building Occupants,

This Wednesday, May 3rd, from 6:00 am to 8:00 am, there will be a compressed air shutdown.  This will allow removal of several 2nd floor compressed air lines and installation of new ductwork in their place.

Within the shutdown duration, GBC is also going to work to install an isolation valve for the 2nd floor to help reduce future impacts.

For questions or concerns about how this may impact your area, contact Denise Stewart, Campus Planning and Facilities Management (CPFM) Design and Construction at 346-2280.