Project 5: Waldo Lake Lindsay Tyler

Project 5: Waldo Lake Lindsay Tyler

Problem: Some of the problems with the site are the accessibility and the uneven terrain. Research: Max. length 5.75 mi (9.25 km) Max. width 2.75 mi (4.43 km) Surface…

Read Article →
P5 Eva Harn

P5 Eva Harn

Wind near Waldo Lake vs. Wind in Portland, OR Normal temps vs. Extremes near Waldo Lake vs. Portland, OR Quality: Temperature. Measured in degrees Fahrenheit…

Read Article →
Project 5 - Thermal Baths - assignment and study

Project 5 – Thermal Baths – assignment and study

Here is the Hudson House Schematic Design presentation. Please start for Wednesday: HUDSON HOUSE 20170603 what is the problem / challenge of the site? research…

Read Article →
The Gorge

The Gorge

Read Article →
Skip to toolbar